Blog

2020 Grant Funds Available for EV Charging Station Projects

An EV ARC.

Electric vehicle charging stations are once again eligible technology projects for 2020 Clean Fuel Advanced Technology (CFAT) funding. Specific electric vehicle supply equipment (EVSE) projects are eligible in all 100 North Carolina counties. Successful EVSE projects will involve no digging, ground-breaking, or pavement cutting.

Electric vehicle sales in the US surpassed 1 million in October of 2018, and the number is rising. As electric vehicles become more mainstream, expansion of charging stations reassures drivers of the ability of electrification to meet their needs.

“We are excited about this opportunity because demand for plug-in electric vehicles is rising, and the need for additional charging infrastructure is growing,” said Rick Sapienza, Clean Transportation Program Director at NC Clean Energy Technology Center (NCCETC).

The CFAT grants program is supported with federal Congestion Mitigation Air Quality (CMAQ) funds provided by the NC Department of Transportation (NC DOT). The primary purpose of the CFAT project is to reduce transportation-related air pollution emissions.  In 2020, up to $1,400,000 in federal funding is being awarded.

Although EVSE has been eligible under CFAT in prior years, recent interpretations of federal regulations made EVSE and other infrastructure projects infeasible. Clarification of those rules helped find this narrow set of projects, which can be funded with less paperwork. For the current round, only EVSE projects that do not have ground disruption or cutting of concrete are eligible. Those projects could include replacement of stranded / non-working chargers, installation of new chargers where the preparation work has been previously completed with proper local permitting and environmental compliance, and installation of new chargers at facilities where no ground disturbance or cutting of concrete is required (such as inside a parking deck).  

In 2019, the CFAT program helped fund 11 electric vehicle charging station projects, delivering 53 new Level 2 EV charging plugs (28 of which are replacements of defunct equipment), 16 solar-powered EV charging plugs and 4 new DC Fast Charge plugs (at two stations).  Read more about these projects (and others) here.

As in prior rounds, other clean transportation technologies are also eligible. In 2018, NCCETC funded conversion of gasoline engines to also run on Liquid Propane Gas (LPG), retrofits of gas vehicles with hybrid electric kits, electric power take-off (ePTO) units to slash idling emissions from utility bucket lift trucks, electric transport refrigeration units (TRUs), and leases of electric cars and other alternative-fueled vehicles.

The deadline to apply for the second round of funding is March 13, 2020.

Learn more about CFAT and view the guidelines, FAQ and application here. All EVSE updates and guidelines are highlighted in yellow. View previous projects funded by CFAT here and here.

Email Rick Sapienza at resapien@ncsu.edu for more information.